Echo Trail #3
APPROVED: 2/23/23
APPROVED: 2/23/23
Extension filed on 12/16/24
Extension of Expiration was approved by Planning Commission staff on 12/17/24
Reason given: "The applicant is unable to begin construction by this date and therefore is
requesting an extension."
Echo Trail
Echo Trail
Case Number: 22-MSUB-0011
Case Number: 22-MSUB-0011
Location: 1505 Echo Trail
Location: 1505 Echo Trail
FF DRO: Partial; proposal backed out of the DRO.
FF DRO: Partial; proposal backed out of the DRO.
Proposal: Add 22 houses with two in the DRO. This development has no onsite water retention. Water detention to be provided on adjacent site.Â
Proposal: Add 22 houses with two in the DRO. This development has no onsite water retention. Water detention to be provided on adjacent site.Â
This development is part of a much larger development that adds additional pressure to Floyds Fork.
This development is part of a much larger development that adds additional pressure to Floyds Fork.
Eventually, just a small development will be the final straw that will bring the entire watershed down.
Eventually, just a small development will be the final straw that will bring the entire watershed down.
In the video below, they had stacked 30 shingles, but the 31st was the tipping point. The damage was done earlier, but when the the last one exposed the problem it was too late! The DRO is in the same threatening situation. We are reaching the tipping point.
In the video below, they had stacked 30 shingles, but the 31st was the tipping point. The damage was done earlier, but when the the last one exposed the problem it was too late! The DRO is in the same threatening situation. We are reaching the tipping point.
Extension Request
Extension Request
12/16/24
Extension Approved
Extension Approved
12/17/24
Plans Submitted with Request
Plans Submitted with Request